The renovation of their stadium field is the latest project which included removal of the existing grass, importing rootzone sand, tilling and laser grading.
Post Type Archives: Projects
Philadelphia Phillies
Hummer Turfgrass Systems has been a part of two full-field renovations for the Philadelphia Phillies, working with Nolan Thomas & Co.
Saucon Valley Country Club
Hummer Turfgrass Systems was hired to install Big Roll Bluegrass sod from Sporting Valley Turf Farms on the main driving range tee at the club.
Tyrone High School
Hummer Turfgrass Systems stripped the existing sod, tilled the soil, graded to provide positive drainage, installed an irrigation system and the Sand Grid Drainage System.
Country Club of York
Hummer Turfgrass Systems completed numerous sodding and hydro seeding projects for the Country Club of York.
Gilman School
The renovated surface features a new two-wire irrigation system, Sand Grid Drainage System and HGT Bluegrass sod. The nearly flat playing surface was constructed for lacrosse and soccer use.
Pennsylvania State University
Hummer Turfgrass Systems has performed many projects over time working at Beaver Stadium with the last full field re-sodding in 2015 and continued field maintenance.