Manheim Township School District

Gilman School

Hummer recently completed some infield maintenance at the Gilman School just in time for the upcoming season!

East Pennsboro

The existing stadium field was struggling with drainage issues and had no irrigation system. Hummer’s team designed a Sand Grid Drainage System and irrigation system for the field and laser graded the entire surface.

The Hill School

Hummer Turfgrass Systems was selected to renovate the Wells-Davidson Pitch and increase its size to 120 yards by 75 yards which was made possible by the removal of an existing running track.